UG awards construction Cleanrooms for new Feringa Building to Kelvin Reinraumsysteme GmbH
The final lot in the tenders for the new Feringa Building has been awarded by the University of Groningen to German cleanroom builder Kelvin Reinraumsysteme GmbH. They are responsible for the realization of two cleanrooms on the ground floor of the Feringa Building. Kelvin RRS will soon join the existing construction team that further consists of Ballast Nedam, De Groot-Lammerink and Wesemann.
Cleanrooms for air-pure research
A clean room is an extremely pure research environment, where external influences - such as undesired air and dust particles - are excluded. In the Feringa Building, two such areas with 'controlled environment' will be located on the ground floor. In these rooms with very high air purity, the university conducts research in the areas of aerospace, nanotechnology, semiconductors and nanolithography, among others.

In Phase 1 (building section 5615) there will be about 500 m2 of cleanrooms. These will be used by the Zernike Institute for Advanced Materials and the Stratingh Institute for Chemistry. In construction phase 2 (building section 5611), the SRON Institute for Space Research will have some 150 m2 of cleanroom space.

Last modified: | 11 April 2024 10.16 a.m. |
More news
-
05 March 2025
Women in Science
The UG celebrates International Women’s Day with a special photo series: Women in Science.
-
16 December 2024
Jouke de Vries: ‘The University will have to be flexible’
2024 was a festive year for the University of Groningen. In this podcast, Jouke de Vries, the chair of the Executive Board, looks back.
-
10 June 2024
Swarming around a skyscraper
Every two weeks, UG Makers puts the spotlight on a researcher who has created something tangible, ranging from homemade measuring equipment for academic research to small or larger products that can change our daily lives. That is how UG...