Skip to ContentSkip to Navigation
About us Latest news News News articles

Initial construction phase of Feringa Building on Zernike Campus to start on 1 July

26 June 2019

On 1 July, contractor Ballast Nedam will start the first construction phase of the new Feringa Building of the University’s Faculty of Science and Engineering. The building on Zernike Campus will take the form of three connected V-shaped wings and will provide space for around 1,400 students and 850 staff members.

The same low vibration technique is used for the Energy Academy Europe (see video)
The same low vibration technique is used for the Energy Academy Europe (see video)

The implementation of the foundations will mark the start of the construction phase in early July. Since the building work will take place next to the current building, construction will be carried out with as little vibration and noise nuisance as possible. The pile foundations will be constructed by boring holes into the ground, reinforcing them and then pouring concrete into them. This method of installing the pile foundations will result in much less nuisance than would driving the piles into the ground, although this method does mean that there will be more construction traffic, including concrete mixers.

Around 2,000 concrete screw piles will be made for the foundation of the Feringa Building, starting on the south end of the construction site.

Location Feringa Building
Location Feringa Building

Construction schedule

The construction process will proceed in phases (see image). Phase 1A will be fully completed by mid-2021, to allow the first research groups of the Faculty to take up residence in the Feringa Building. Next, Phase 1B will be completed, after which sections 17 and 18 of the Nijenborgh 4 building will be demolished to make space for the implementation of Phase 2. This will start at the beginning of 2022, to be completed in the summer of 2023 .

Last modified:11 April 2024 10.17 a.m.
View this page in: Nederlands

More news

  • 29 April 2024

    Tactile sensors

    Every two weeks, UG Makers puts the spotlight on a researcher who has created something tangible, ranging from homemade measuring equipment for academic research to small or larger products that can change our daily lives. That is how UG...

  • 29 April 2024

    Behind the scenes: how UG and Hanze UAS students are jointly developing a Mars rover

    This year the students of the Makercie team are participating in the physical edition of the European Rover Challenge in Poland. Read more about the team and the collaboration between the RUG and Hanze UAS here.

  • 23 April 2024

    Nine MSCA Doctoral Network grants for FSE researchers

    Nine researchers of the Faculty of Science and Engineering have received a Horizon Europe Marie Sklodowska Curie Doctoral Network grant.